VAT: When is the building of a house complete? (And why is it important?)

By   11 June 2019

Completion of a residential dwelling

A technical point which comes up surprisingly often and seems innocuous is: when is a building “complete”? The following case is helpful, and I thank Les Howard for bringing it to my attention.

The date that the construction of a dwelling is deemed to be complete is important for a number of reasons. The issue in the case of Mr and Mrs James was whether certain works could be zero rated via the VAT Act Schedule 8 Group 5 Item 2 (The supply in the course of the construction of a building designed as a dwelling…) or as HMRC contended, they were the reconstruction or alteration of an existing building and the work should be standard rated.

Background

The James used a contractor to plaster the entire interior of their house in the course of its construction. However, the work was demonstrably defective to such an extent that the James commenced legal proceedings. A surveyor advised that all of the old plaster needed to be hacked off and replaced by new plastering installed by a new firm. The stripping out and replacement works took place after the Certificate of Completion had been issued.

The James claimed input tax on the house construction via the DIY Housebuilders’ Scheme.

Technical

HMRC refused the James’ claim to have the remedial work zero-rated because, in their view, the re-plastering works amounted to the reconstruction or alteration of the house which was, when the supplies were made, an “existing building”. They proffered Note 16 of Schedule 5 which provides that “the construction of a building” does not include “(a) … the conversion, reconstruction or alteration of an existing building”.

They stated that zero-rating only applied if the work formed part of the construction of a zero-rated building. They had previously decided that the work of snagging or correction of faults carried out after the building had been completed could only be zero-rated if it was carried out by the original contractors and correction of faults formed part of the building contract. When the snagging is carried out by a different contractor, the work is to an existing building and does not qualify for zero rating.

The James stated that the Customs’ guidelines on snagging do not take into account extraordinary circumstances. Their contention was that the re-plastering works were zero rated because they had no choice but to engage the services of a different contractor other than the one who carried out the original works.

Decision

The judge found for the appellant – the re-plastering works were zero rated.

There was a query as to why The James applied for a Certificate of Completion before the plastering was completed. In nearly all cases such a certificate would crystallise the date the building was complete.

The reasons were given as:

  • the need for funds. The James could not remortgage the house without the certificate and they needed to borrow a substantial amount
  • they could not reclaim VAT under the DIY Housebuilders’ Scheme until the Certificate of Completion had been issued
  • they were aware that the building inspector was beginning to wonder why the building works were taking such a long time
  • they needed the house assessed for Council Tax which could only happen when the certificate had been issued
  • the Certificate was issued as part of the procedure required by the Building Act 1984 and the Building Regulations of 2000

These reasons were accepted by the judge.

Despite the respondents stating that:

  • for the reasons given above
  • the fact that the James had been living in the house for some time
  • they had obtained the Certificate of Completion
  • the new plastering work had been done by the new plasterer such that the house had been constructed before supply of the new plasterer’s services had been made
  • the house was an “existing building”

the judge was satisfied that in the circumstances the new plastering work was supplied in the course of the construction of the building as a dwelling house and that there was no reconstruction or alteration of an existing building in the sense contemplated by Note (16) to Group 5 Schedule 8.

He observed that the Certificate of Completion records that the substantive requirements of the Building Regulations have been satisfied. But to the naked eye the old plasterwork was obviously inadequate and dangerous ad he could not possibly consider that the construction project had finished until the new plasterwork was installed. The James’ construction project was to build a new dwelling house. Plasterwork of an acceptable standard was an integral part of the construction works. The new plasterwork was done at the earliest practicable opportunity.

Commentary

Care should be taken when considering when the completion of a house build takes place. There are time limits for DIY Housebuilders’ Scheme clams and clearly, as this case illustrates, usually work done to a house after completion does not qualify for zero rating. So, if the owner of a house is thinking of, say, building a conservatory for example, it is more prudent in VAT terms to construct it at the same time as a new house is built, and certainly before completion.

I would say that the appellant in this case achieved a surprisingly good result.

VAT DIY Housebuilders’ Scheme Top 10 Tips

By   14 September 2018

If you build your own home, there is a scheme available which permits you to recover certain VAT incurred on the construction. This puts a person who constructs their own home on equal footing with commercial housebuilders. There is no need to be VAT registered in order to make the claim. As always with VAT, there are traps and deadlines, so here I have set out the Top Ten Tips.

An in-depth article on the DIY Housebuilders’ Scheme here

The following are bullet points to bear in mind if you are building your own house, or advising someone who is:

  1. Understand HMRC definitions early in your planning

Budgeting plays an important part in any building project. Whether VAT you incur may be reclaimed is an important element. In order to establish this, it is essential that your plans meet the definitions for ‘new residential dwelling’ or ‘qualifying conversion’. This will help ensure that your planning application provides the best position for a successful claim. One point to bear in mind, and which I have found often produces difficulties, is the requirement for the development to be capable of separate (from an existing property) disposal.

  1. Do I have to live in the property when complete?

You are permitted to build the property for another relative to live in. The key point is that it will become someone’s home and not sold or rented to a third party. Therefore, you can complete the build and obtain invoices in your name, even if the property is for your elderly mother to live in. However, it is not usually possible to claim on a granny annexe built in your garden (as above, they are usually not capable of being disposed of independently to the house).

  1. Contractors

Despite the name of the scheme, you are able to use contractors to undertake the work for you. The only difference here will be the VAT rate on their services will vary depending on the nature of the works and materials provided.

  1. What can you claim?

A valid claim can be made on any building materials you purchase and use on the build project. Also, services of conversion charged at the reduced rate can be recovered. However, input tax on professional services such as architect’s fees cannot be recovered.

  1. Get the VAT rate right

It is crucial to receive goods and services at the correct rate of VAT.  Services provided on a new construction of a new dwelling will qualify for the zero rate, whereas the reduced rate of 5% will apply for qualifying conversions. If your contractor has charged you 20% where the reduced rate should have been applied, HMRC refuse to refund the VAT and will advise you go back to your supplier to get the error corrected. This is sometimes a problem if your contractor has gone ‘bust’ in the meantime or becomes belligerent. Best to agree the correct VAT treatment up front.

  1. Aid your cash flow

If you wish to purchase goods yourself, it will be beneficial to ask your contractor to buy the goods and combine the value of these with his services of construction. I this way, standard rated goods become zero rated in a new build.  If you incur the VAT on goods, you will have to wait until the end of the project to claim it from HMRC.

  1. Claim on time

The claim form must be submitted within three months of completion of the build, usually this is when the certificate of practical completion is issued, or the building is inhabited. although it can be earlier if the certificate is delayed.

  1. Use the right form

HMRC publish the forms on their website

Using the correct forms will help avoid delays and errors.

  1. Send everything Recorded Delivery

You are required to send original invoices with the claim. Therefore, take copies of all documents and send the claim by recorded delivery. Unfortunately, experience insists that documents are lost…

  1. Seek Advice

If you are in any doubt, please contact me. Mistakes can be costly, and you only get one chance to make the claim. Oh, and don’t forget that this is VAT, so any errors in a claim may be liable to penalties.

VAT – Building your new home. Claiming VAT on costs

By   14 December 2015

Building your own home is becoming increasingly popular.  There are many things to think about, and budgeting is one of the most important.

The recovery of VAT on the project has a huge impact on the budget and care must be taken to ensure that a claim is made properly and within the time limits.  You don’t have to be VAT registered to make a claim, this is done via a mechanism known as The DIY Housebuilders’ Scheme.  It has specific rules which must be adhered to otherwise the claim will be rejected.

If you buy a new house from a property developer, you will not be charged VAT. This is because the sale of the house to you will be zero-rated. This allows the developer to reclaim the VAT paid on building materials from HMRC. However, if you build a house yourself, you will not be able to benefit from the zero-rating. The DIY Housebuilder’ Scheme puts you in a similar position to a person who buys a zero-rated house built by a property developer.

Who can make a claim?

You can apply for a VAT refund on building materials and services if you are:

  • building a new home in which you will live
  • converting a building into a home
  • building a non-profit communal residence, eg; a hospice
  • building a property for a charity.

Eligibility

New homes

The house must:

  • be separate and self-contained (eg; not an extension)
  • be for you or your family to live or holiday in (not for sale when complete)
  • not be for business purposes (you can use one room as a work from home office)
  • not be prevented from sale independently to another building by planning permission or similar (eg; a granny annexe).

A claim may also be made for garages built at the same time as the house and to be used with the house.

Contractors working on new residential buildings should zero rate their supplies to you, so you won’t pay any VAT on these.

Conversions

The building being converted must usually be a non-residential building (eg; a barn conversion). Residential also buildings qualify if they haven’t been lived in for at least 10 years.

You may claim a refund for builders’ work on a conversion of non-residential building into home. These supplies will be charged at the reduced rate of 5% for conversion works.  If the standard rate of 20% s charged incorrectly, you will not be able to claim the standard rated amount. Care should be taken that the contractor understands the VAT rules for conversions as these can be complex.

Communal and charity buildings

You may get a VAT refund if the building is for one of the following purposes:

  • non-business – you can’t charge a fee for the use of the building
  • charitable, eg; a hospice
  • residential, eg; a children’s home

What can you claim on?

Building materials

You may claim a VAT refund for building materials that are incorporated into the building and can’t be removed without tools or damaging the building.

What doesn’t qualify

You cannot claim for:

  • building projects outside the UK
  • materials or services that don’t have any VAT, eg;  were zero-rated or exempt
  • professional or supervisory fees, eg architects and surveyors
  • the hire of plant, tools and equipment, eg; generators, scaffolding and skips
  • building materials that aren’t permanently attached to or part of the building itself
  • some fitted furniture, electrical and gas appliances, carpets or garden ornaments
  • supplies for which you do not have a VAT invoice

Examples of items you can, and cannot claim for are listed below.

How to claim

To claim a VAT refund, send form 431NB or 431C to HMRC

Local Compliance National DIY Team
SO987
Newcastle
NE98 1ZZ

What you need to know

You must claim within 3 months of the building work being completed.

You will usually get the refund in 30 working days of sending the claim.

You must include the following with your claim:

  • bank details
  • planning permission
  • proof the building work is finished – eg a letter from your local authority
  • a full set of building plans
  • invoices – including tenders or estimations if the invoice isn’t itemised
  • bills and any credit notes

VAT invoices must be valid and show the correct rate of VAT or they will not be accepted in the claim.

HMRC usually examine every claim closely and often query them, so it pays to ensure that the claim is as accurate as possible first time.  We find a review by us before submission ensures the maximum amount is claimed and delays are avoided.

Payments made after completion of the house cannot be claimed, and only one claim can be made for the whole project, so cashflow may be an issue.

Examples of items that you can claim for
The items listed below are accepted as being ‘ordinarily’ incorporated in a building (or its site). This is not a complete list.
  • Air conditioning
  • Building materials that make up the fabric of the property (for example, bricks, cement, tiles, timber, etc)
  • Burglar and fire alarms
  • Curtain poles and rails
  • Fireplaces and surrounds
  • Fitted kitchen furniture, sinks, and work surfaces
  • Flooring materials (other than carpets and carpet tiles)
  • Some gas and electrical appliances when wired-in or plumbed-in
  • Heating and ventilation systems including solar panels
  • Light fittings (including chandeliers and outside lights)
  • Plumbing materials, including electric showers, ‘in line’ water softeners and sanitary ware
  • Saunas
  • Turf, plants, trees (to the extent that they are detailed on scheme approved by a Planning Permission) and fencing permanently erected around the boundary of the dwelling
  • TV aerials and satellite dishes
Examples of items that you cannot claim for
This is not a complete list.
    • Aga/range cookers (Unless they are solid fuel, oil-fired or designed to heat space or water. Note: not all cookers are ‘space heaters’ because they incidentally radiate heat while operating. To be classified as such they must be fitted to a heating module or boiler)
    • Free-standing and integrated appliances such as: cookers, fridges, freezers, dishwashers, microwaves, washing machines, dryers, coffee machines
    • Audio equipment (including remote controls), built-in speakers, intelligent lighting systems, satellite boxes, Freeview boxes, CCTV, telephones
    • Consumables (for example, sandpaper, white spirit)
    • Electrical components for garage doors and gates (including remote controls)
    • Bedroom furniture (unless they are basic wardrobes) bathroom furniture (for example, vanity units and free-standing units)
    • Curtains, blinds (unless they are integral, that is, blinds inside sealed double-glazed window units),
    • Carpets
  • Garden furniture and ornaments and sheds. 

Please contact us if you require assistance with a DIY Housebuild project.